Sulphur tank 1T-602 upgrade

Upgrade of a sulphur tank within an operating industrial facility.

Sulphur tank 1T-602 upgrade
Client / participants
TCO
Location
Tengiz
Period
2013

Work scope

Repair of the roof, floor, shell, piping and steel access structures; rerouting of instrumentation and electrical cabling.

Disciplines and constraints

Civil and structural, mechanical and piping, electrical and instrumentation disciplines. Constraints included limited space, a hazardous area with high H₂S levels and a tight schedule.

A case from the team portfolio. Parameters and dates refer to the project described.