Planned maintenance
Inspection and maintenance schedules, preventive works and monitoring of equipment condition.
Technical operation and maintenance of facility infrastructure after construction. Scope and frequency are agreed for each facility and contract.

Inspection and maintenance schedules, preventive works and monitoring of equipment condition.
Agreed servicing of ventilation, heating, cooling, water, drainage and fire-protection systems.
Fault identification, preparation of work scopes, replacement of worn components and system updates for changing facility needs.
Maintenance logs, work records, outstanding-item tracking and recommendations for operation and future repair planning.
An agreed package of solutions, works and documentation for the chosen service. Stages, responsibilities and handover materials are defined in the technical brief.
Keep the design intent, construction site and future operation connected.
Geodesy, geology and site information.
Concept, calculations and detailed design.
Technical conditions and review.
Supply, civil works and installation.
Testing, documentation and handover.
Maintenance, repairs and system development.