Team portfolio
200 m³/h batching plant
Two batching units with auxiliary buildings and engineering infrastructure for the FGP TCO project.

- Client / participants
- NefteStroyService · KPJV · TCO
- Location
- Tengiz
- Period
- 2014–2016
Technical solution
Two 100 m³/h units, with a total capacity of 200 m³/h. Technology vendor Elkomix, Turkey. September 2014–September 2016, with participation through NefteStroyService LLP on the KPJV project for FGP TCO.
Multidisciplinary design
Civil, process, mechanical, piping, electrical and instrumentation design. Challenges included an initial lack of water, power and sewerage infrastructure, additional engineering facilities and delays in vendor information.