200 m³/h batching plant

Two batching units with auxiliary buildings and engineering infrastructure for the FGP TCO project.

200 m³/h batching plant
Client / participants
NefteStroyService · KPJV · TCO
Location
Tengiz
Period
2014–2016

Technical solution

Two 100 m³/h units, with a total capacity of 200 m³/h. Technology vendor Elkomix, Turkey. September 2014–September 2016, with participation through NefteStroyService LLP on the KPJV project for FGP TCO.

Multidisciplinary design

Civil, process, mechanical, piping, electrical and instrumentation design. Challenges included an initial lack of water, power and sewerage infrastructure, additional engineering facilities and delays in vendor information.

A case from the team portfolio. Parameters and dates refer to the project described.